Warehouse Specification
- Bangsai Warehouse
-
- 3 tons/sqm floor loading
- many different floor areas to choose from as needed
- Rama6 Warehouse
-
- 3 tons/sqm floor loading
- many different floor areas to choose from as needed
- Samrong Warehouse
-
- 3 tons/sqm floor loading
- many different floor areas to choose from as needed
- B38 Warehouse
-
- 5 tons/sqm floor loading 1.3 metres above the road level
- 12 metres clear storage height
- storage areas from 2,500 to 10,000 m3 available
- warehouse roofing fully insulated
- warehouses have office space included
- special storage designs can be built to fit the client's needs


Site Location

Bangsai Warehouse
Rama6 Warehouse
- on the ChaoPraya River with a jetty for docking lighter
- on a main road near the city centre suitable for a goods distribution centre
- the warehouse site has never been flooded
Samrong Warehouse
- on the ChaoPraya River with a wharf ocean-going vessels can access
- on a main road near the industrial ring road bridge
- the warehouse site has never been flooded

B38 Warehouse
Bangsai Warehouse
- on the ChaoPraya River with jetties for lighters transferring bulk cargoes from ocean going vessels
- siting suitable for distribution of goods to northern, north-eastern and western provinces
- the warehouse site has never been flooded


B38 Warehouse
- on the BangNa-Trat highway, near the on-off ramps of the Buraphawithi Expressway and the Bangkok - Cholburi Motorway
- siting suitable for distribution of goods
- free flood area



Facilities & Services
Bangsai Warehouse
- Three 80 Ton truck scales available
- has Chao Praya River frontage suitable for docking up to 8 lighters
- parking area available for more than100 truck and trailer combinations
- belt conveyors for unloading goods
- front end loaders and fork lifts available
- 3-phase electrical system
Rama6 Warehouse
- has Chao Praya River frontage suitable for docking lighters
- 3-phase electrical system
Samrong Warehouse
- 80 Ton truck scale available
- has a wharf at which ocean going vessels can dock
- 3-phase electrical system
B38 Warehouse
- large parking area available
- dock leveller loading and unloading available
- 3-phase electrical system


Safety Systems
Bangsai Warehouse
- site security guards on duty 24 hours
- CCTV supervision
- lightning protection on all buildings
- fire fighting systems
- fire fighting training carried out yearly
- Tank Car
Rama6 Warehouse
- site security guards on duty24 hours
- CCTV supervision
- lightning protection on all buildings
- fire fighting systems
- fire fighting training carried out yearly
- surrounded by flood protection walls
Samrong Warehouse
- site security guards on duty 24 hours
- CCTV supervision
- lightning protection on all buildings
- fire fighting systems
- fire fighting training carried out yearly
B38 Warehouse
- site security guards on duty 24 hours
- CCTV supervision
- lightning protection on all buildings
- fire fighting systems
- fire fighting training carried out yearly
- Tank Car